Project case study (STAR)
25-minute Quest 3 LOTO practice loop. 100% operator certification and 0 incidents in 14 months on a high-speed stamping line.
Tier-1 auto supplier had two near-misses in 18 months tied to LOTO sequence errors on a high-speed stamping line. OSHA inspection raised the bar; classroom training wasn’t transferring.
As a Senior Instructional Designer, I led the end-to-end design and development of this project — from discovery and needs analysis through final delivery and implementation support.
Build a 25-minute VR practice loop that lets every line operator rehearse the 7-step LOTO sequence on their own machine model, with xAPI telemetry back to the LMS.
HIPAA Refresh: 'The 8-Minute Rule'
Cut a 90-minute HIPAA module to 8 minutes of branching scenarios. Completion went from 61% → 92% across a 14-hospital health system.
Pilot Mode: First-90-Days SaaS Onboarding
A 90-day onboarding for new AEs that cut attrition by 71% and time-to-first-deal from 88 → 47 days.
AML Red Flags: A Branching Triage Game
25-minute branching simulation with confidence-weighted scoring. SAR-flag rate tripled post-launch.
Phonics Coach: Adaptive K-2 Reading
Audio-first 12-minute adaptive diagnostic. +0.8 grade-level gain over control across a small district pilot.